Post a comment on the text below

4.3.3        Policies

As stated in the water Blueprint (EC 2012c) there remains a need for a better implementation of water policies and mainstreaming the water policy objectives into other policies. In a report for the European Parliament it is stated that, especially with regard to floodplain restoration, the implementation of measures is hindered by a lack of effective tools to design the most cost-efficient measures (Zandstra, 2015). The delayed floodplain restoration across Europe leads to a cost that can be avoided by better implementation of legislation of over 15 billion Euros per year (Zandstra, 2015).

You cannot post comments to this consultation because you are not authenticated. Please log in.